Development and Optimization of Reservoir MJ

dc.contributor.authorPetersen, Melissa
dc.contributor.authorIsbister, Jordan
dc.date.accessioned2011-04-05T20:38:18Z
dc.date.available2011-04-05T20:38:18Z
dc.date.issued2011-04-02
dc.description.abstractDifferent development plans to effectively exploit Reservoir MJ have been evaluated and optimized. First, a history match was completed to accurately predict future reservoir fluid behavior. Then different well patterns were evaluated, with the prospect of waterflooding. Other design work included production well designs which entail drill string, casing, cementing, and hydraulic programs as well as pump and drilling rig selections. Finally, the most effective development plan was selected on the basis of economic evaluation and production performance.en_US
dc.description.authorstatusStudenten_US
dc.description.peerreviewyesen_US
dc.identifier.urihttps://hdl.handle.net/10294/3242
dc.language.isoenen_US
dc.publisherFaculty of Applied Science and Engineering, University of Reginaen_US
dc.relation.ispartofseriesPSE 8en_US
dc.titleDevelopment and Optimization of Reservoir MJen_US
dc.typeTechnical Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
abstract-only.txt
Size:
106 B
Format:
Plain Text

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
2.33 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections