Development and Optimization of Reservoir MJ
dc.contributor.author | Petersen, Melissa | |
dc.contributor.author | Isbister, Jordan | |
dc.date.accessioned | 2011-04-05T20:38:18Z | |
dc.date.available | 2011-04-05T20:38:18Z | |
dc.date.issued | 2011-04-02 | |
dc.description.abstract | Different development plans to effectively exploit Reservoir MJ have been evaluated and optimized. First, a history match was completed to accurately predict future reservoir fluid behavior. Then different well patterns were evaluated, with the prospect of waterflooding. Other design work included production well designs which entail drill string, casing, cementing, and hydraulic programs as well as pump and drilling rig selections. Finally, the most effective development plan was selected on the basis of economic evaluation and production performance. | en_US |
dc.description.authorstatus | Student | en_US |
dc.description.peerreview | yes | en_US |
dc.identifier.uri | https://hdl.handle.net/10294/3242 | |
dc.language.iso | en | en_US |
dc.publisher | Faculty of Applied Science and Engineering, University of Regina | en_US |
dc.relation.ispartofseries | PSE 8 | en_US |
dc.title | Development and Optimization of Reservoir MJ | en_US |
dc.type | Technical Report | en_US |