Chloride Salts Removal by non Planted Constructed Wetlands Receiving Synthetic Brines from Belle Plaine Potash Mining
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Four pilot-scale constructed wetlands (CWs) were employed to study the fate and
transport of the two dominant chloride salts (NaCl and KCl) receiving the synthetic
brine. The characteristics of the brine solution are made up with a 10:1 concentration
ratio between NaCl and KCl based on data obtained from Belle Plaine potash mine site.
The multi-layer soils were designed to function as a main salt filtering component
comprising of Regina Clay (grain size <0.002 mm), Brick Sand (grain size <4.75 mm)
and sharp gravels (grain size between 6.3-19.1 mm) despite the clay layers contained a
poor compact condition (Db =1.4, <1.6 g/cm3). The volume of void space in the
compacted clay was reduced to approximately half the natural state following application
of pressure (4,505 cm3 to 2,743 cm3). The CW systems were operated by the 16-day
format (batch 1-3) and the 4-day format (batch 4). During the 16-day format
experiments, the best K+ removal rate was recorded on Cell2 as 92.1±63.4%
(4.6±5.3mg/l) while Cell 4 contributed the maximum removal of Na+ and Cl- as
44.8±76.7% (53.2±92.4mg/l) and 50.5±109.6% (85.3±184.3.4mg/l). In the 4-day format
operation, the chloride breakthrough curve was discovered in all treatment CW cells,
excluding the control. Moreover, the curve stated at less than 6 hours (C/C0 > 0.05) and
approximately reached the break point (C/C0 > 0.95) after passing 48 hours. Then the
clay media was exhausted and lost its ability to remove Cl-. However, the study was not
able to determine the breakthrough curves in neither Na+ nor K+ cases during batch
experiment 4 due to unidentified ending points on both cations.