Assessing the Performance of Aspen Plus and Promax for the Simulation of CO2 Capture Plants

dc.contributor.advisordeMontigny, David
dc.contributor.authorAhmadi, Fakhteh
dc.contributor.committeememberHenni, Amr
dc.contributor.committeememberIdem, Raphael
dc.contributor.externalexaminerShirif, Ezeddin
dc.date.accessioned2012-09-06T15:25:49Z
dc.date.available2012-09-06T15:25:49Z
dc.date.issued2012-05
dc.descriptionA Thesis Submitted to the Faculty of Graduate Studies and Research In Partial Fulfillment of the Requirements for the Degree of Master of Applied Science in Process Systems Engineering, University of Regina. ix, 72 l.en_US
dc.description.abstractCarbon dioxide is a prominent greenhouse gas whose emissions have significantly increased due to human activities. Fossil fuel-fired power plants are the largest source of CO2 emissions, which results in a need for CO2 capture at these power plants. Prior to building a large scale CO2 capture plant, a pilot or demonstration plant is set up to confirm the feasibility of the plant. Simulation techniques are needed before actually constructing the plant, in order to improve the reliability and to increase productivity. A number of simulation software tools have been developed and are widely used to complete the simulation of a power plant integrated with a CO2 capture plant. Therefore, the capability of the software to model and simulate the plant correctly, and to generate accurate and reliable results, is of particular importance. In this work, the performance of two of the most commonly used process simulators for CO2 capture, namely ASPEN Plus and PROMAX, was evaluated and compared. In order to achieve this goal, eight data series from two CO2 capture pilot plants were selected and simulated with the above-mentioned simulators. The pilot plant data came from the International Test Centre for CO2 Capture (ITC) and the Esbjerg CO2 from Capture to Storage (CASTOR) project. Simulations were compared to experimental results using several parameters, including CO2 recovery, lean and rich loadings, steam and heat duties, CO2 percentage in the product stream, and the temperature and concentration profiles in the columns. Results showed that both software packages could predict the behavior of the system accurately and generate reliable results. The obtained results showed that in most cases, particularly in predicting the absorber and stripper profile along the column, PROMAX generated results that were closer to the actual experimental data, when compared to ASPEN.en_US
dc.description.authorstatusStudenten
dc.description.peerreviewyesen
dc.identifier.tcnumberTC-SRU-3569
dc.identifier.thesisurlhttp://ourspace.uregina.ca/bitstream/handle/10294/3569/Ahmadi_Fakhteh_Sadat_200284690_MASC_PSEN_Fall2012.pdf
dc.identifier.urihttps://hdl.handle.net/10294/3569
dc.language.isoenen_US
dc.publisherFaculty of Graduate Studies and Research, University of Reginaen_US
dc.subjectCO2 capture
dc.subject.lcshCarbon sequestration--Computer simulation
dc.subject.lcshFossil fuel power plants--Environmental aspects--Computer simulation
dc.subject.lcshAspen plus
dc.titleAssessing the Performance of Aspen Plus and Promax for the Simulation of CO2 Capture Plantsen_US
dc.typeThesisen
thesis.degree.departmentFaculty of Engineering and Applied Scienceen_US
thesis.degree.disciplineEngineering - Process Systemsen_US
thesis.degree.grantorUniversity of Reginaen
thesis.degree.levelMaster'sen
thesis.degree.nameMaster of Applied Science (MASc)en_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Ahmadi_Fakhteh_Sadat_200284690_MASC_PSEN_Fall2012.pdf
Size:
1.47 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
2.31 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections